Aging Grid Fleets Drive Predictive Partial Discharge Adoption
Utilities operating transformer fleets well beyond their original design life are increasingly deploying partial discharge monitoring to detect insulation degradation before it progresses to catastrophic failure, a capability that periodic offline testing alone cannot provide between scheduled maintenance windows. Roughly 30 percent of transformers in mature grids now exceed their typical thirty-year design life, creating a substantial addressable base for predictive monitoring as utilities prioritize detecting degradation early over waiting for scheduled inspection cycles to identify developing faults this analysis today broadly overall industry wide currently most regional markets served consistently this year nationwide across.
Market Impact: Spending grew 17% in 2024








